Company Profile
Foshan Sinogar Aluminium Co., Ltd, founded in 1995, locates in Foshan " China Aluminum Industrial City". In past 20 years, the company has obtained a rapid development, turned into a large modern enterprise of professional manufacturing of aluminum profiles and fabricated aluminum parts in China.
Foshan Sinogar Aluminium Co., Ltd, There are800 staff working in 600,000 Square metre factory area in Guangdong. 15 sets of extrusion lines ranged from 500mt to 3600mt. Annual capacity reaches 80,000 tons.Our aluminium profiles and processing product cover more than 30 provinces and municipalities across the country and have been exported to more than 50 countries and regions around Asia, Africa, America and Europe, such as Indonesia, Philippines, Malaysia, South Africa, Spain, UK and Australia, and etc.
Detailed Photos
60 System Description
Slim sash window in the 60mm series with advanced insulation from U value =1.8w/sqm K.
- Symmetrical, stable structural design with identical corner and T connectors.
- Extremely Slim sash and ordinarily sash can be choose.
- A sturdy three-chamber system with up to 39mm glass-fiber-reinforced thermal break PA66
- Standard euro groove and concealed hinges.
- Insulated double and triple glazing up to 39mm.
- Optional imported hardware brand. Like SI, Giesse.
- Warranty 10 Years
PERFORMANCE CHARACTERISTICS:
Water tightness up to 450PA
Air Permeability 75/150
Wind Load up to 1500 pa ULS
Soundproofing up to RW31
System depth 60
Surface Treatment Powder coating/ PVDF
Product Description
Aluminium Alloy |
6063,6060,6061,6082 |
Temper |
T3-T8 |
Quality Standard |
GB/T 5237-2008, EN755-9,EN12020, JST,AA STANDARD. |
Quality Certificate |
ISO9001, ISO14001,OHSAS18001,DNV,QUALANOD, QUALICOAT |
Useage |
Construction materials |
Surface Treatment |
Power coating: AKZO Noble, Tiger,DUPONT,JOTUN, etc. |
PVDF: 2coated, 3 coated. |
Anodizing: Silver, Champagne, Bronze, Black, Gold, Imitating Steel,Titanium |
Wood grain: As per customers'samples. |
Polishing, Mechanical, Chemcial. |
Electrophoresis: Sliver,Champagne, Black, Golden,Titanium, etc. |
Processing |
Drilling, Bending, Aluminium profile fabrication, Precise cutting ect. |
MOQ |
3000 Kilogram |
Packing |
protection film + shrink plastic film or kraft paper. |
Timber packing + Metal trolly; |
Payment Terms |
TT 30% before production, the rest should be balanced before loading. |
FAQ
1.Q:How long for the cutting dies and received sample?
A: Depend on the size of dies, gernerally speaking, 7-10 days for die cutting, 3days-5days sampling after die ready.
2 Q:What is your lead time for production?
A: For one 40ft container, 3-4week after deposit confimred. 100 tons can be ready within 4-5 weeks.