Sinogar Aluminum Co., Ltd was founded in 1997 is one of the top enterprises which manufactures building and industry aluminum in China. In past 20 years, the company has obtained a rapid development, turned into a large modern enterprise of professional manufacturing of aluminum profiles and fabricated aluminum parts in China.
Sinogar Aluminum Co., Ltd focus on aluminum design, extrusion, surface treatment and fabrication. Now we have four factories in Foshan. Our independent billet casting factory and extrusion factory promise our raw materials and quality stable. There are 23 lines extrusion machine from 600mt to 6000mt. Meanwhile we have 3 lines for anodizing, including brushes, mechanical Polish and chemical Polish lines. 3Lines for Powder coating can be provided more than 2000mt per month. Total annual capability is 50, 000tons.
In 2010, Sinogar Aluminum has set up our own aluminum windows and doors factory for develop our windows and doors system. In the last 9 years, we have own 50 series, 65 series, 80 series, 108series, and also 120 series, 132 series. Our window and doors system sells to Southeast Asia and South America market.
In 2014, we established our own CNC processing factory with 20sets of CNC machines including 3sets of 4 axis machine and 1 set of 5 axis machine. We provided all kinds of precision aluminum products for our clients in the world. Meanwhile we have independent team to ODM new aluminum product for all kinds of industry. Our aluminum profiles and processing product cover more than 30 provinces and municipalities across the country and have been exported to more than 50 countries and regions around Asia, Africa, America and Europe, such as Indonesia, Philippines, Malaysia, South Africa, Spain, UK and Australia, and etc.
FAQ 1.Q:How long for the cutting dies and received sample?
A: Depend on the size of dies, gernerally speaking, 7-10 days for die cutting, 3days-5days sampling after die ready.
2 Q:What is your lead time for production?
A: For one 40ft container, 3-4week after deposit confimred. 100 tons can be ready within 4-5 weeks.